Product finder

Nematodes

Nematoda

Products against nematodes

5 products with valid registration, according to the State Catalogue of Pesticides of Georgia.

ProductRateCropMethod and timing of treatmentPre-harvest interval, days (treatments)
Nemasol, SL 80-120 g/m² nurseries of perennial crops Mechanised application to a depth of cm and covering the soil with plastic film. sowing or planting 30 days after - (1)
60-120 g/m² Ornamental plants, Tomato, Cucumber Mechanised application to a depth of cm and covering the soil with plastic film. sowing or planting 30 days after - (1)
TRIPP 900 EC 5,0 tomato (greenhouse) above-ground application: the product is applied to the soil directly with a sprayer. after application the soil must be watered to ensure good penetration of the product. after this, seedlings may be planted in the soil. - (1)
5,0 tomato (greenhouse) drip irrigation: apply the product in the greenhouse at the recommended rate by drip irrigation 3-6 days before transplanting seedlings. a second watering is not necessary. do not apply the product after planting - (1)
1,7 tomato (greenhouse) drip irrigation: apply the product in the greenhouse at the recommended rate by drip irrigation 3-6 days before transplanting seedlings. a second watering is not necessary. do not apply the product after planting - (1)
2,5 Potato 1. the first application of the product is before planting (2.5 l/ha); 2. the second application is 45 days after the first (2.5 l/ha) 49 (2)
1,7 pepper (greenhouse) drip irrigation: apply the product in the greenhouse at the recommended rate by drip irrigation 3-6 days before planting seedlings. a second watering is not necessary. do not apply the product after planting - (1)
Dealton, WG 3.5-7 l/ha Fruit trees spraying during the growing season. so that the root zone is well soaked and the product well distributed over the irrigated area. volume rate 1500-2000 l/ha water. apply the product 2 weeks after planting or after the problem appears. if necessary, repeat the procedure after 2-3 weeks. - (2)
1.5-2 l/ha Ornamental plants spraying during the growing season; if necessary, again after 2-3 weeks. volume 300-500 l/ha - (1-2)
3.5-7 l/ha Nut crops spraying during the growing season. so that the root zone is well soaked and the product well distributed. on irrigated areas. volume rate 1500-2000 l/ha water. apply the product 2 weeks after planting or after the problem appears. if necessary, again after 2-3 weeks - (2)
3.5-7 l/ha Grapevine spraying during the growing season. so that the root zone is well soaked and the product well distributed. on irrigated areas. volume rate 1500-2000 l/ha water. apply the product 2 weeks after planting or after the problem appears. if necessary, again after 2-3 weeks - (2)
2.5 - 3.5 l/ha Potato spraying during the growing season. so that the root zone is well soaked and the product well distributed over the irrigated area. volume 1500-l/ha water. apply the product 2 weeks after planting or after the problem appears. if necessary, repeat the procedure after 2-3 weeks. - (2)
2.5 - 3.5 l/ha Vegetables spraying during the growing season. so that the root zone is well soaked and the product well distributed over the irrigated area. volume 1500-l/ha water. apply the product 2 weeks after planting or after the problem appears. if necessary, repeat the procedure after 2-3 weeks. - (2)
2.5 - 3.5 l/ha Cereals spraying during the growing season. so that the root zone is well soaked and the product well distributed over the irrigated area. volume 1500-l/ha water. apply the product 2 weeks after planting or after the problem appears. if necessary, repeat the procedure after 2-3 weeks. - (2)
Mekar, МE 0,75-1,5 Citrus Spraying during the growing season 3 (2)
Verango Prime SC 400 625 ml/ha Eggplant, Tomato, Pepper soil treatment 1-3 days before transplanting seedlings or after transplanting. volume 2000– 10000 l/ha 60 (1-2)
625 ml/ha Cucurbits, Watermelon, Zucchini, Cucumber, Melon soil treatment 1-3 days before transplanting seedlings or after transplanting. volume 2000– 10000 l/ha 60 (1-2)
625 ml/ha Carrot soil application 1-10 days before sowing, followed by incorporation to a depth of 10-20 cm. volume 200– 1000 l/ha 60 (1-2)
625 ml/ha Potato soil application 1-3 days before planting, followed by incorporation to a depth of 10-20 cm. volume 200– 800 l/ha 60 (1-2)
625 ml/ha Potato application into the furrow at planting; volume 180-300 l/ha 60 (1-2)